The project is focused on achieving high energy efficiency and optimal indoor climate conditions.
We have begun implementing a comprehensive HVAC, cooling, and heating solution in the modern administrative complex Chalupkova Offices – Phase I.
The HVAC system is provided by two Fläkt air handling units with a capacity of 60,000 m³/h, which distribute fresh air through chilled beams with temperature control. Air extraction from the garages is managed using Ventra JET fans.
For cooling and heating, we use an energy-efficient system with a total installed cooling capacity of 1,224 kW. The setup combines TRANE heat pumps and TRANE chiller compressor units connected to LUVE dry coolers. Additional heating is provided by TRANE geothermal heat pumps with a total capacity of 621 kW and three KOPŘIVA electric multi-boilers with a capacity of 144 kW, located in the plant room on the first basement level.
This technical solution ensures stable, efficient, and reliable operation of the entire facility.