27.07.2025

KLIMAK Children’s Camp 2025

This year’s camp was held with a new look in new facilities. What we didn’t change was the large number of experiences for the young campers. Experienced instructors and children’s catering were once again the clear choice this year. The kids tried a little bit of everything… Adrenaline on the children’s via ferrata at Zvonička,

26.06.2025

Modern offices for Haberl Real Estate

Our team is currently working on the multifunctional T68 building, specifically office space for the developer Haberl Real Estate. We are delivering ventilation and cooling for individual rooms, with ducting and elements designed to match the architecture and create a visually striking detail. Duct fabrication was handled by our production company TECHNOV. Technologies installed include

11.06.2025

The Run Slovakia: our team race from Košice to Bratislava

For the sixth time, our great KLIMAK Hot and Cool Running Team took part in the nationwide running competition The Run Slovakia 2025, held on June 6–8. This year 89 teams from Slovakia and abroad competed. We once again put together a group of enthusiastic runners ready for a shared adventure. Everyone trained hard all

19.05.2025

Continuing work on the POŠTA 1930 project

Our colleagues are currently carrying out extensive construction works on the Pošta 1930 building in Košice to make the central heating distribution accessible and to adjust the layout of the premises. These works covered the 1st, 2nd, and 3rd floors, where we also replaced the central heating distribution and radiators.

17.04.2025

Buildings of the Year 2024 breathe with us!

In this year’s “Building of the Year 2024” competition, two projects we had the opportunity to work on were successful – and we are rightly proud of the results. The title of Building of the Year went to the modern office building The Mill, which has risen in the Mlynské nivy zone. With its 17

13.03.2025

Bringing comfort and sustainability: Downtown Yards

Bratislava is preparing for the Downtown Yards project on the site of the former Klingerka complex. This multifunctional complex will consist of 80% residential units and 20% mixed-use spaces.w It includes several buildings, among them high-rises: SO 204 (18 floors), SO 202 (15 floors), and SO 203 (7 floors), intended mainly for housing. Smaller buildings