24.06.2026

KLIMEO at the HVAC Summer School 2026

At KLIMAK, we place great emphasis on education, following the latest trends, and supporting future experts in the HVAC field. We are therefore immensely proud of our colleagues from the Prague branch, KLIMEO, who participated in the 24th annual selective HVAC Summer School this June. This traditional and highly respected event took place in the

23.06.2026

KLIMAK finishes The RUN Slovakia: Hot&Cool running team claims 21st place

533 kilometers, 48 stages, and three days of non-stop running across Slovakia. Our Hot&Cool running team has completed its seventh appearance at Slovakia’s longest relay race. From this year’s The RUN Slovakia, we take home a fantastic 21st place, total exhaustion, but also proof that we work 100% as a team. From the Tatras to

02.06.2026

Stronger than ever: Our summer teambuilding in Jasná

A great team, fun and the inspiring environment of the Low Tatras. At KLIMAK, we have long taken pride in the fact that our strong team spirit doesn’t end at the office desk. This year’s summer teambuilding, named STRONGER than EVER and hosted by the Swissôtel Damian Jasná, clearly proved just that. We have successfully

25.05.2026

The KLIMAK COMFORT division has secured a major project in Piešťany

Our team from the KLIMAK COMFORT division is reporting a successful start to a new project. We will be fully managing the implementation of all HVAC systems for Lakeside 36, a modern apartment building located on the banks of the Sĺňava water reservoir in Piešťany. We are exclusively responsible for the technological systems of this

18.05.2026

The future of HVAC after F-gases

On May 13, 2026, an expert conference organized by our Climaport division took place at LAB28 in Bratislava. The event focused on the current topic of the future of HVAC systems and natural refrigerants. In particular, the main topic was Swegon R290 technology – a modern solution using the natural refrigerant propane (R290). As a

12.05.2026

Mechanical room in 10 days: prefabrication changes HVAC rules

A mechanical room completed in just 10 days? With prefabrication, it’s a reality. On the Chalupkova Offices project in Bratislava, we managed to cut installation time by 50–70% compared to traditional methods. The key was thorough preparation—from a precise BIM model to the off-site prefabrication of piping assemblies in cooperation with Synklad Energy. On-site installation

28.04.2026

KLIMAK kicks off cooperation with SPU Nitra

On Monday, April 20, we officially kicked off our new educational program at the Faculty of Engineering of the Slovak University of Agriculture in Nitra, aimed at connecting student life with real industry experience. With an opening lecture led by our colleagues, we launched a collaboration that brings together the academic environment and real-world projects

15.04.2026

New Project in Lúčky Spa: Hotel Smrekov Is Taking Shape

A new hotel and wellness complex, Smrekov, is currently under development in the Lúčky spa area, with our team contributing to the project. As construction progresses, it is already clear that it will deliver modern facilities for guests and set new standards for indoor comfort. Our role is to deliver technological solutions for heating, cooling,